1050 Arastradero, Building A&B – Rolling Conditioned Air and Exhaust Fan Shutdown – HVAC Preventive Maintenance – Saturday, August 23rd, 2025

Aug 20, 2025 | Activities

Dear, 1050 Arastradero Colleagues,

The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning and exhaust system on the roof. This work will require us to shut down one unit at a time. Due to the short duration of the shutdown and expected cool morning temperatures, we do not anticipate any temperature issues. Weather forecast for Saturday is high 75 Deg.

DATE:  Saturday, August 23rd, 2025

TIME:  ​4:00 AM – 12:30 PM

IMPACT: Conditioned Air Shutdown – The building temperature may be slightly cooler or warmer depending on outside air. Fume hoods may go into alarm. Our technicians will reset alarms upon completion of the work.

SAFETY IMPACT: Fume hoods will be without exhaust periodically. Please refrain from conducting experiments when system is in alarm.

If you have any questions or concerns regarding this shutdown, please do not hesitate to contact me.

Thank you for your cooperation.

Regards,

Vincent Nino
Assistant Chief Engineer – School of Medicine
Facilities Field Services – Stanford Health Care

Stanford Medicine
Facilities Service & Planning 
Facilities, Infrastructure, Safety, & Security
300 Pasteur Drive, Grant S044B
Mail Code: 5102
Palo Alto, CA 94304

Tel: 650.721.4234 
Cell: 650.223.9537
vnino@stanfordhealthcare.org