1651 Page Mill – Crane Lift Pick – Roof Top Hvac Repairs – Saturday, May 17th, 2025 – 6:00am – 8:00am

May 7, 2025 | Activities

Dear 1651 Page Mill Colleagues,

The Operations & Maintenance, along with our Vendor Commercial Air Services is scheduling for a crane lift operation. Commercial Air Services Inc. will be replacing conditioned air equipment on the roof. The crane operation will be setup in the south west entry of the building. Please see attached map for crane location.

It is recommended that everyone find an alternate route and avoid the crane work area during the time specified below, as pedestrians will be restricted from passing through this area.

CRANE OPERATION

DATE: Saturday, May 17th, 2025

TIME: 6:00am – 8:00am

IMPACT: Parking spaces marked in red in the map below will be closed during the time indicated above.

What to expect:  The building will be closed during the crane operation. Safety cones and barricades will be noticeable around Crane lift location