1701 Page Mill Building – Rolling Conditioned Air Shutdown – Preventative Maintenance – Saturday, April 25th, 2026 – 4:00am – 12:30pm

Apr 22, 2026 | Activities

Dear 1701 Page Mill Colleagues,

The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning and exhaust system. This work will require us to shut down one unit at a time. Due to the short duration of the shutdown and expected cool morning temperatures, we do not anticipate any temperature issues.

DATE: Saturday, April 25th, 2026

TIME: ​4:00am – 12:30pm

IMPACT: Conditioned Air Shutdown – The building temperature may be slightly cooler or warmer depending on outside air. Fume hoods may go into alarm. Our technicians will reset alarms upon completion of the work.

SAFETY IMPACT: Fume hoods will be without exhaust periodically. Please refrain from conducting experiments when system is in alarm.

If you have any questions or concerns regarding this shutdown, please do not hesitate to contact me.

Thank you for your cooperation.

Regards,

Vincent Nino
Assistant Chief Engineer – School of Medicine
Facilities Field Services – Stanford Health Care