Notice of Work: Electrical work to 3172 Porter – Building Electrical Shutdown/Work
Specific Project Scope:
- Electrical work associated with upgrade of the backup power system.
Anticipated Schedule:
- Equipment Room 235C: Monday, 1/27/25 5:00am-2:00pm
- Shutdown: Tuesday, 1/28/25 5:00am-6:00am.
Building Impacts:
- Electrical power for (1) dedicated circuit will be shut down. No electrically powered equipment will be affected. RM 235C, Circuit LS2A1 -2,4 (no equipment is currently fed by this circuit).
- Panel will be shut down approximately for 1hr. Outlets/hard wired equipment in these rooms will have no power for that time: 235, 235A-H, 2E02
Safety Impacts:
- No life safety impacts to the occupants are anticipated.
Contacts:
- SoM OFPM Representative: Chris Dillard, cdillard@stanford.edu, (510) 459-5470
- SoM S&EM Representative: Naomi Takahashi, ntaka@stanford.edu, (650) 665-3734
- Contractor: Philip Bugay, philipb@hillhouseconstruction.com, (510) 342-9105