Dear 1701 Page Mill Colleagues,
Siemens is planning to perform the annual fire sprinkler inspection on Friday, November 21st. This will include operation of the interior enunciator panel for testing.
The annual inspection will last until 1:00 pm.
DATE: Friday, November 21st, 2025
TIME: 6:00 am – 1:00 pm
IMPACT: The enunciator panel will be activated intermittently during this time.
Any fire alarm activity outside of the timeframe indicated above should be treated as an actual fire event and normal evacuation plans should be followed.
CARL HICKMAN
Assistant Chief Engineer – School of Medicine
