by Emily Li | Apr 22, 2026 | Uncategorized
Dear 1070 Arastradero Colleagues, The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning system. This work will require us to shut down one unit at a time. Due to the short duration of the shutdown...
by Emily Li | Apr 22, 2026 | Activities
Dear 1701 Page Mill Colleagues, The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning and exhaust system. This work will require us to shut down one unit at a time. Due to the short duration...
by Emily Li | Apr 20, 2026 | Activities
During today’s weekly electrical repair meeting, our contractor provided the list of activities scheduled for this week and in the coming weeks: Week of 4/20/26 – 4/24/26Transformer Pad and Transition Cabinet Crane Pick, Friday April 24th , 7:30am –...
by Emily Li | Apr 10, 2026 | Activities
Dear Building Colleagues, The Office of Facilities Planning and Management along with Veolia, engineering consultant will perform a feasbility study of 1050A&B building’s electrical system starting on April 17, 2026 from 8am – 4pm. This study includes...
by Emily Li | Apr 8, 2026 | Announcements
Building: Rawwen Hall (3174 Porter Drive) Date of alarm: Wednesday, April 8, 2026 Time of alarm: Approx. 3:20 AM Cause: a smoke detector on the first floor was triggered by an unknown cause. PAFD and Security responded and cleared the area of actual fire and reset the...