by Emily Li | Jun 1, 2026 | Activities
TSS will be on site to perform the testing and certification of Fume Hoods located Falk, PSRL, Beckman, Lane, RAF2 & 1651 Pagemill Road starting Monday June 1 and will be on site daily until completed. As numerous buildings will be tested an exact date cannot be...
by Emily Li | May 26, 2026 | Activities
Dear 1651 Page Mill Colleagues, In support of School of Medicine, Operations and Maintenance is scheduling a temporary shutdown to portions of the buildings air conditioning system to conduct diagnostic testing and maintenance. This work is necessary to maintain...
by Emily Li | May 26, 2026 | Activities
Dear Colleagues, During a routine inspection, an Operations and Maintenance technician identified that the domestic hot water heater serving the building had failed. We are working with a School of Medicine vendor to repair the unit as quickly as possible....
by Emily Li | May 21, 2026 | Activities
Good morning, I hope everyone is having a good week thus far. It has come to our attention that 3180 Porter Drive will need to be fully vacated for the entire day on Friday, May 29th due to HVAC repairs and installations being performed by Crane Construction. In...
by Emily Li | May 19, 2026 | Activities
Dear Colleagues, The temporary mobile generator had an issue mid morning, and it automatically switched from primary engine # 1 to backup engine #2. Presently @ 75 deg F outside temperature, the load on engine #2 is greater than 80%. As building load demand increases...
by Emily Li | May 18, 2026 | Activities
Good Afternoon Colleagues, A reminder of scheduled power shutdowns next week to complete the electrical repair of 1050 buildings’ utility power connection. Week of 5/18/26 – 5/22/26Shutdown building temporary utility power, connect temporary mobile...