by Emily Li | May 12, 2026 | Activities
Good Afternoon Colleagues, During today’s weekly electrical repair meeting, our contractor provided the list of activities below scheduled for this week and in the coming weeks: Week of 5/4/26 – 5/8/26 - Since Tuesday (5/5) of last week, 1050A&B...
by Emily Li | May 11, 2026 | Activities
Dear 3165 Porter Building Colleagues, The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning and exhaust system. This work will require us to shut down one unit at a time. Due to the short duration...
by Emily Li | May 1, 2026 | Activities
Dear Colleagues, The temp main breaker that kept tripping this morning was tested and found to be bad. Our electrical contractor found a replacement circuit breaker and had been delivered on site. SoM Facilities Operations received confirmation from the City of Palo...
by Emily Li | Apr 30, 2026 | Activities
Dear 3174 Porter Colleagues, The Operation and Maintenance team is scheduling to perform maintenance on the building’s electrical Manual Transfer Switch. This work will require us to shut down building’s emergency generator, as a safety precaution. Due to...
by Emily Li | Apr 29, 2026 | Activities
Dear 3174 Porter Colleagues, The Operation and Maintenance team is scheduling to perform maintenance on the building’s electrical Manual Transfer Switch. This work will require us to shut down building’s emergency generator, as a safety precaution. Due to...
by Emily Li | Apr 29, 2026 | Activities
Good Afternoon Colleagues, The City of Palo Alto (CoPA) approved a permit to energize temporary power connection to the building from the newly installed utility transformer. Facilities Operations confirmed temporary connection of building normal power to CoPA utility...