by Emily Li | Apr 29, 2026 | Activities
Good Afternoon Colleagues, The City of Palo Alto (CoPA) approved a permit to energize temporary power connection to the building from the newly installed utility transformer. Facilities Operations confirmed temporary connection of building normal power to CoPA utility...
by Emily Li | Apr 27, 2026 | Activities
Dear 3172 Porter Colleagues, The Operation and Maintenance team is scheduling to perform maintenance on the building’s electrical Manual Transfer Switch. This work will require us to shut down building’s emergency generator, as a safety precaution. Due to...
by Emily Li | Apr 27, 2026 | Activities
Dear 3172 Porter Colleagues, The Operation and Maintenance team is scheduling to perform maintenance on the building’s electrical Manual Transfer Switch. This work will require us to shut down building’s emergency generator, as a safety precaution. Due to...
by Emily Li | Apr 22, 2026 | Activities
Dear 1701 Page Mill Colleagues, The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning and exhaust system. This work will require us to shut down one unit at a time. Due to the short duration...
by Emily Li | Apr 20, 2026 | Activities
During today’s weekly electrical repair meeting, our contractor provided the list of activities scheduled for this week and in the coming weeks: Week of 4/20/26 – 4/24/26Transformer Pad and Transition Cabinet Crane Pick, Friday April 24th , 7:30am –...
by Emily Li | Apr 10, 2026 | Activities
Dear Building Colleagues, The Office of Facilities Planning and Management along with Veolia, engineering consultant will perform a feasbility study of 1050A&B building’s electrical system starting on April 17, 2026 from 8am – 4pm. This study includes...