1070 Arastradero – Rolling Conditioned Air Shutdown – Preventive Maintenance – Saturday, April 25th, 2026 – 4:00am – 12:30pm

Apr 22, 2026 | Uncategorized

Dear 1070 Arastradero Colleagues,

The Operation and Maintenance team is scheduling to perform preventative maintenance on the building’s air conditioning system. This work will require us to shut down one unit at a time. Due to the short duration of the shutdown and expected cool morning temperatures, we do not anticipate any temperature issues.

DATE: SaturdayApril 25th, 2026

TIME: 4:00AM – 12:30PM

IMPACT: The building temperature may be slightly cooler or warmer depending on outside air.

SAFETY IMPACT: None anticipated

If you have any questions or concerns regarding this shutdown, please do not hesitate to contact me.

Thank you for your cooperation,

Regards,

Vincent Nino
Assistant Chief Engineer – School of Medicine
Facilities Field Services – Stanford Health Care