Recent Posts
- City of Palo Alto Waste Water Inspection in 1050 Arastradero A & B – Thursday, May 28, 2026
- 3155 Porter Drive – Notice of PCCT Deinstallation Work at 3155 Porter Drive Impacts
- UPDATE: 1050 Arastradero Electrical Repairs – Two days (5/19-5/20) 3-hours normal power shutdown to complete the electrical repair
- 3165 Porter Building – Rolling Conditioned Air Shutdown – Saturday, May 16, 2026 – 4:00 AM – 12:30PM
- UPDATE: 1050 Arastradero Electrical Repairs – Temporary Utility Power Connection on Tuesday, May 5, 2026, 5am – 8am
